FISERV FORUM
First Truss Raised In Place
The process of setting the truss—which weighs 23 tons—required careful safety considerations, planning, and engineering[…]
JP Cullen performed the steel erection for the new Milwaukee Bucks Arena. The total project consisted of approximately 8,000 tons of structural steel. The steel construction consisted of typical structural column and beam steel framing for the surrounding bowl structure including 6 levels plus a roof. The roof over the arena floor consisted of 9 total long span roof trusses, approximately 33 feet deep, with the longest truss spanning 313 feet weighing 102 tons. The first piece of steel was set on November 7, 2016. Two hundred and ninety (290) days later, JP Cullen and the project team celebrated the Topping Off.
Facts About the Milwaukee Bucks Arena Steel:
Daktronics, a worldwide industry leader in LED technology, partnered up with JP Cullen on multiple projects including Fiserv Forum, UW-Madison Kohl Center, UW-Madison Field House, […]
Project Overview When Woodward Inc., an international aerospace and energy technology company, builds a new manufacturing and office building, they think big — 462,393 square […]